2024
Year
36 months (ongoing)
Duration
120,000 sq ft
Area
₦3.5B
Budget
The Story Behind Mixed-Use High Rise
The Challenge
A 12-storey mixed-use tower combining retail, office, and residential floors — each with different structural and MEP requirements — on a tight urban site with neighboring buildings close on three sides.
Our Solution
We deployed a top-down construction method for the basement parking while the superstructure rose simultaneously. A unitized curtain wall system was prefabricated off-site to accelerate facade installation.
The Result
Currently at floor 9 of 12, the project is tracking two weeks ahead of schedule with zero lost-time incidents — a testament to our rigorous safety and project management systems.
Project Details
- Client
- Atlas Development Company
- Location
- Victoria Island, Lagos
- Year
- 2024
- Duration
- 36 months (ongoing)
- Area
- 120,000 sq ft
Services Provided
Explore Every Phase
From concept renders to construction progress and the final completed spaces — see the full story of this project.

Tower under construction

Lower floors with facade installed