Mixed-Use High Rise
Back to Portfolio
Construction2024

Mixed-Use High Rise

Victoria Island, Lagos

2024

Year

36 months (ongoing)

Duration

120,000 sq ft

Area

₦3.5B

Budget

The Story Behind Mixed-Use High Rise

The Challenge

A 12-storey mixed-use tower combining retail, office, and residential floors — each with different structural and MEP requirements — on a tight urban site with neighboring buildings close on three sides.

Our Solution

We deployed a top-down construction method for the basement parking while the superstructure rose simultaneously. A unitized curtain wall system was prefabricated off-site to accelerate facade installation.

The Result

Currently at floor 9 of 12, the project is tracking two weeks ahead of schedule with zero lost-time incidents — a testament to our rigorous safety and project management systems.

Project Details

Client
Atlas Development Company
Location
Victoria Island, Lagos
Year
2024
Duration
36 months (ongoing)
Area
120,000 sq ft

Services Provided

Structural EngineeringConstruction ManagementMEP WorksFacade Engineering
Start a Similar Project

Explore Every Phase

From concept renders to construction progress and the final completed spaces — see the full story of this project.

Tower under construction

Tower under construction

Lower floors with facade installed

Lower floors with facade installed

Let's Build Your Next Project

Inspired by what you see? Our team is ready to bring your vision to life with the same level of craftsmanship and attention to detail.

Request Callback